CDM Automation Team

Objective:

The CDM Collaborative Automation Team is tasked with reviewing current Traffic Flow Management System (TFMS) capabilities and determining if they still meet systemic needs and defining what, if any, changes or enhancements are desired. The CDM Steering Group (CSG) has specifically tasked the new team with reviewing the current processes in the assignment and management of delay program slots to determine if they meet current operations analysis, post event analysis, and flight operator needs; and providing recommendations for ways in which they can be enhanced to provide for current systemic needs. Additionally, the CSG has tasked the team to explore the use of Traffic Management Advisor/Time Based Flow Management scheduling times in TFMS, and to make recommendations for the use of TBFM information within TFMS.

CAT_subteam

CDM Automation Team Members

Current Documents:

CAT Oct Telcon Notes.doc 331.5 KB 9/13/2022 5:02 pm
CAT SEPT 2013 Meeting.doc 338.5 KB 9/13/2022 5:02 pm
CAT TEAM DAS Recommendation.doc 337.0 KB 9/13/2022 5:02 pm
CAT TEAM TBFM Metered Times of Departure Recommendation.doc 343.0 KB 9/13/2022 5:02 pm
CAT_Meeting Notes_Jun_15_2016.doc 342.5 KB 9/13/2022 5:02 pm
CAT_NOV_2014.pdf 327.8 KB 9/13/2022 5:02 pm
SCT _ CAT Joint Meeting Minutes_January 16_2015.pdf 491.8 KB 9/13/2022 5:02 pm
Tasking 47 CAT Delay Assignments and the Use of TBFM Times within TFMS.doc 234.0 KB 9/13/2022 5:02 pm
Tasking 55 SCT_CAT Data Quality.doc 233.5 KB 9/13/2022 5:02 pm